1. Start with the crop and the business case

What are you growing, how much, and what will it earn? Be realistic about yields, prices, labour and market access. The crop determines the climate you need, and the climate determines the structure.

2. Assess your site

Look at sun, wind, slope, drainage, soil, access, water and power. Photograph the site and note where the prevailing wind comes from. Our guide to choosing a greenhouse site walks through what to check.

3. Decide on structure and climate control

Choose between tunnelhouse, pitched roof or a combination. Decide on cladding, ventilation and whether you’ll automate. See our guides on tunnelhouses versus pitched roof and on ventilation.

4. Check consents and rules

Check building consent, resource consent and district plan rules with your council early. Late surprises are expensive.

5. Set a budget and stage the project

Get a quote that spells out inclusions and exclusions. Decide whether to build all at once or in stages. Allow contingency for site works and services.

6. Plan the build and the operation

Agree on a programme that fits your crop cycle. Plan how you’ll operate: labour, irrigation, ventilation routines and maintenance.

7. Plan for the long term

A greenhouse is a long-term asset. Plan for re-covering, vent servicing and eventual expansion from the start.

Ready to start planning? Tell us about your project

Tell us about your project and we’ll come back with straight advice, with no obligation.

Get a free quote

Frequently asked questions

How long does a commercial greenhouse project take?

It depends on size, consents, site works and scheduling. We’ll give you a realistic timeframe in your quote.

Can I get help with the planning stage?

Yes. Our enquiry process is designed for that. Tell us your plans and we’ll help you shape them.